Skip to main content
JiranLink

Majestic Maxim

Cheras
Partially VerifiedChecked 9 Apr 2026Updated

Official references, media assets, and practical research notes for this building.

Tenure

Leasehold

Total units

2,136 (4 blocks)

Built-up

650 – 819 sq ft

Floors

44

Parking

1–2 bays per unit

Year completed

2021

Nearest Transit

Taman Connaught MRT — 15 min walk

Kajang Line (MRT1)

Taman Connaught MRT is reachable by a 15-minute walk or short feeder bus. Rapid KL feeder routes serve this corridor.

Flood Risk

MODERATE

New building on elevated ground with good drainage, but the wider high-density Cheras area around Jalan Jubilee can experience localised flash flooding during heavy monsoon rain.

Maintenance Fee

RM 0.25 psf

Approx. RM163–205/month — one of the most affordable maintenance rates in the Cheras corridor given the unit sizes.

Transaction Prices

Median: RM 411,500 (RM525 psf)

Range: RM 300,000 – RM 498,000

42 transactions recorded

Source: Brickz.my (JPPH S&P transactions), "Majestic Maxim Cheras"

Calculate mortgage for this building →

Before You Move In

Free printable checklist for the handover inspection at Majestic Maxim or any KL/PJ condo.

Get the move-in defect checklist →

Internet Providers

UnifiTIME FibreMaxis

Location & Navigation

Get directions to Majestic Maxim using your preferred navigation app.

Building guide overview

Majestic Maxim is a large affordable leasehold development in Cheras comprising 4 blocks and 2,136 units across 44 floors, completed in 2021 by Maxim Holdings. Units run 650-819 sq ft with 1-2 parking bays each, making it a popular first-home and investment option due to its lower entry price. Taman Connaught MRT (Kajang Line) is reachable by a 15-minute walk or short feeder bus, and maintenance fees at RM0.25 psf are among the most affordable in the corridor given the unit sizes.

Before you visit

Always verify details in person and never pay deposits before viewing.

Project snapshot

Developer
Maxim Holdings
Project type
Condominium
Scale
4 blocks, high-density township

Next steps

Open the area guide or compare another building in the same neighborhood.

Neighbor Insights

Local notes are anonymized before publication. A context-reviewed badge means the contribution or source context was checked for plausibility; it is not a guarantee that every quoted claim is independently verified.

REVIEWED

"Good value for the price. You're not getting luxury finishes but everything works and management keeps common areas clean."

general— Resident contributor(22 Aug 2025)

"2,136 units across 4 blocks means lifts can be slow during peak hours. Budget extra time in the morning."

general— Resident contributor(18 May 2025)

"The sheer number of units means the facilities — pool, gym, multipurpose hall — are always busy. Go early or off-peak or you'll be queuing."

amenity— Resident contributor(20 Nov 2025)
REVIEWED

"Value for money is the honest USP. At this price in Cheras with a functioning JMC and clean common areas, it's hard to complain."

general— Property investor, multiple units(6 Jan 2026)

Majestic Maxim FAQ

How much is the maintenance fee at Majestic Maxim?

The published rate is RM 0.25 psf of unit area per month. Approx. RM163–205/month — one of the most affordable maintenance rates in the Cheras corridor given the unit sizes.

How far is the nearest train station from Majestic Maxim?

Taman Connaught MRT (Kajang Line (MRT1)) is listed at about 15 minutes' walk. Taman Connaught MRT is reachable by a 15-minute walk or short feeder bus. Rapid KL feeder routes serve this corridor.

Is Majestic Maxim freehold or leasehold?

Our records list Majestic Maxim as Leasehold. Always confirm against the actual title or an official land-search before purchase.

Does Majestic Maxim have flood risk?

Our records assign Majestic Maxim a moderate flood tier in our records: New building on elevated ground with good drainage, but the wider high-density Cheras area around Jalan Jubilee can experience localised flash flooding during heavy monsoon rain. Building-level tiers describe history and drainage context, not guarantees — verify during heavy rain seasons.

When was Majestic Maxim completed?

Our records date completion to 2021. Check the building page's sources for the underlying evidence.

Sources & References

Data compiled from Maxim Holdings project materials and community sources. Building images are from the official Maxim Global project page and are shown to present the project; available for removal on request. — Our methodologyLast updated:

Sponsored resources

Fibre coverage links for KL condos. Sponsorship does not influence editorial building research.